Black Widow Security BW 3 Channel Manuel d'utilisateur Page 12

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 27
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 11
PAGE-12 UPDATED 11-5-2014
STEP 2: Marking panel and footing layout
Note: Before applying mounting attachments, drawing a system layout is highly recommended.
For our demonstration of the Black Widow installation we will be using a simulation roof. Fire lanes
Are not included during this example. If required by regional specifications, account for fire lane and position
Your layout accordingly.
2.1
Start at the left/top of the layout and mark the top/left corner of the first panel in the top row.
Use a lumber crayon for all marks during step 2.
2.2
Move to the left/bottom of the layout and mark the bottom/left corner of the first panel in that
row.
Patent pending P/N: BW-S, BW-B, BW-F.
Vue de la page 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 26 27

Commentaires sur ces manuels

Pas de commentaire